ENEL / Rai Way
BIM FOR O&M SPECIFICATIONS
TIM
DIGITAL TWIN | CENTRALI TIM • Asset assessment and goal setting • POC supply for Digital Twin telephone exchanges and POPs of the TIM network
CINECA – Technopole
BIM AS-BUILT MODEL – DC LEONARDO
CINECA
DCIM ADOPTION AND CUSTOMIZATION DCIM • DCIM installation and configuration at CINECA headquarters
Fastweb
DIGITAL TWIN | DC TORPAGNOTTA
IRIDEOS
DIGITAL TWIN | DC NETWORKS
ATOS
DUE DILIGENCE | TIM DC NETWORKS
Rai Way
O&M SPECIFICATIONS | EDGE DC NETWORK
Fastweb
DUE DILIGENCE | POP AND DC NETWORKS ITALY
Fastweb
MAINTENANCE PLAN | DC and POP NETWORKS.